- Completed design and detailing services for many Pulp and Paper mills
- Pulp Mill Expansion Project Piping Engineering
- Pulp Mill Expansion Project
Calculation of Hydraulics in ETP cross-country pipe
- Pulp Mill Expansion Project Piping Engineering
- Pulp Mill Expansion Project, PAN AFRICAN Paper Mill,Kenya
Piping Engineering
- ANSALDO Project
Design of duct drawings
- Stress analysis of Interconnecting Piping between stacked Heat Exchangers.
- (Bharat Petroleum Corporation Limited, Mumbai)
Design of Expansion joint for Fixed type heat exchangers
- (Indian Oil Corporation Limited, Panipet Refinery)
Preparation of fabrication drawings for Shell and Tube Heat Exchangers.
- (JAM Petro Chemical Company & ISGEC Projects)
Design and verification of manufacturing drawings of HX and Pr.Vessels for conformance to ASME SEC VIII Div I Code and TEMA
- (Tamilnadu Petro-Products limited, Manali - Expansion Project)
Generation of Isometric Drawings
- (MOTOROIL-HELLAS & NEAD Projects)
Design of Pressure Vessels, Columns and preparation of Mechanical Data sheet using Microprotol and PC002 softwares
- (IOCL-Panipet Refinery)
Generation of Iso.Drawings for Chemical Dosing,N.Pit, Heat Exchanger and Trim Cooler,Acid and Caustic Bulk handling areas.
- (HOLCIM (LANKA) LIMITED project.)
“Compressed Air Pipe sizing and Preparation of Piping Engg drawings”
- (JP Chunar Cement Plant)
“Utility Pipe sizing and Preparation of Piping Engg drawings”
- (Chennai Petroleum Corporation Limited, Chennai)
Off-site Automation Project-Process, Mechanical and Piping Engg for Motor Spirit, High Speed Diesel and Fuel Oil Blending system.
- (Coromandal Fertilizers Ltd, Vizag)
Process Engg for 1MTPD Pilot Plant (NPK Fertilizers)
- IMC Ltd/GMR Ltd-Hyderabad Intl Airport)
Process Engg for ATF storage and handling facility at Hyderabad Airport
- (Metso Paper, Sweden)
Thermal Design of Heat Exchangers and preparation of detailed manufacturing drawing for TNPL.
- Thermal Design of Heat Exchangers and preparation of detailed manufacturing drawing for ITCBPL
- Thermal Design of Weak Black Liquor Cooler and preparation of detailed manufacturing drawing.
- Design of Carbon steel Rubber Lined Tanker( Cap 10KL)
Thermal design of Heat exchangers for Pulp Mills
Preparation of manufacturing drawings as per international code
- Star, BILT, West Coast and Century Paper Mill-
Blow Heat Recovery system Piping and Design of Accumulators and Blow Tanks
- Floating, Production, Storage and Off-loading (FPSO) vessel, KIKEY project
Generation of Isometric drawings
- White Liquor Oxidation Plant for Star and Century Paper Mills Piping Engg. Received appreciation letter from Lundsberg-USA for piping engineering
- Vedanta Minerals Ltd
Process and Inst Air Piping engineering
- (IOCL Panipet Refinery Project)
Preparation of Single and stacked Heat exchangers manufacturing drawings as per TEMA and EIL specification
- Stress analysis of Vapour line
- Detailing of Phthalic Anhydride plant
- Design of storage tanks and fabrication dwg preparation as per API650
- Thermal design of heat exchangers
- Stress analysis of brine solution pipeline
- Stress analysis of tank support
- Kakatiya Thermal Power Project, Stage-1, Unit-1 (1x500MW)
Design and detailing of storage tanks
- Maharashtra State Power Generation Corporation Limited-Khaparkheda Thermal Power Station, Expansion Project (1x500MW)
Design and detailing of storage tanks
- Project: NOKIA-Foxcon
Design and detailed engg of Utility piping engg
- Stress analysis of Lean Gas piping
- Design vetting of storage tanks and detailing of vessel
- Design and detailing of Amine package filters and skid piping
- Design of LIQUID SULPHUR STORAGE TANK of capacity 7500 tons (Dia 26mx9m height) as per API 650-12 Edition with internal steam heating coils and preparation of GA drawing.
End user: Reliance Industries Limited, Jamnagar
Project: Jamnagar Gasification Project (J3 Program)
End user consultant: FLOUR
- Design of Pressure vessels. Closed drain Sump Tanks, Knockout Drums, Air Receivers to ASME Sec VIII Div 1
- Design of High pressure vessels (Pressure 263bar(g) and tested at 375bar(g)) as per ASME Sec VIII Div 2
- Design of steel Chimney as per IS: 6533
Flue gas flow rate: 30000NcuM/Hr
Chimney base diameter – 1metre and height 85metres
- Design of LPG underground storage tanks of capacity 7.5KL and 10KL and obtaining CCOE approval for the tank as well as factory.
- Design and detailing of Pressure vessel to ASME Sec VIII Div 1 to get ASME U-Stamp for the fabrication unit.
- Design and detailing of Pressure vessel to ASME Sec VIII Div 2 to get ASME U2-Stamp,
R-Stamp and S-stamp.
- Design validation as per ASME Sec VIII Div 1 and 2 and as per TEMA and other codes and assessment of residual life of Pressure vessels and heat exchangers.
- Design and detailing of Trailer Tanks of capacity 27 CuM.
- Study, analysis and suggesting suitable modified pipe support for piping systems to arrest vibration in piping.